First line – 1.00 MW (2015)
Second line – 6.72 MW (2016)
Unisolar participation in the project:
- Consultations on choosing the optimal configuration of inverter equipment
- Supply of inverter equipment
- Supply of photovoltaic modules
- Service support of inverter equipment and monitoring systems