Photovoltaic station “TSEKYNIVSKA”, VINNITSA REGION

Put into operation. 

INSTALLED CAPACITY - 3.05 MW

Phase I – 0.5 MW (2013)

Phase II – 1.00 MW (2013) 

Phase III – 0.45 MW (2014) 

Phase IV – 0.8 MW (2017)

 Unisolar participation in the project: 

  1. Engineering support at all stages of the project; 
  2. Supply of inverter equipment; 
  3. Supply of photovoltaic modules; 
  4. Supply of cable and wire products; 
  5. Service support of inverter equipment and monitoring systems.